FOI LANÇADO HOJE O CONCURSO PARA:
Vasco de Gama Frigate Modifications
a) Work Package 1 (WP1): Chilled Water System and Main Circuit.
b) Work Package 2 (WP2): Mast and Primary Structure.
c) Work Package 3 (WP3): Secondary Structure.
d) Work Package 4 (WP4): Cabling and Electrical.
e) Work Package 5 (WP5): Piping.
f) Work Package 6 (WP6): Installation.
g) Work Package 7 (WP7): General Support Works