Mensagens recentes

Páginas: [1] 2 3 4 5 6 ... 10
1
Marinha Portuguesa / Re: Substituição das Fragatas Classe Vasco da Gama
« Última mensagem por saabGripen em Hoje às 07:34:20 pm »

Alguns objectivos:

- Prevent obsolescence and extend the sustainable life cycle of the VGAM FFGH until
at least 2035;

- Provide the military capabilities of the OPV3S considering an operational life of 35
years;

- To ensure maximum possible commonality between the SEWACO systems of the
VGAM FFGH and those of the OPV3S
2
Força Aérea Portuguesa / Re: Força Aérea Portuguesa: Album de Fotografias
« Última mensagem por Lusitano89 em Hoje às 07:33:47 pm »



3
Marinha Portuguesa / Re: Substituição das Fragatas Classe Vasco da Gama
« Última mensagem por saabGripen em Hoje às 07:29:47 pm »

  Concurso de Modernização das VdG e Equipamento dos NPO


O concurso na NSPA com o nome "FFGH MLU/OPV SEWACO " foi reactivado hoje, com prazo de conclusão de 30 de Junho.

Mantém as mesmas características.


Vasco da Gama Class Frigates (VGAM FFGH) are currently in use by the Portuguese Navy.
The VGAM FFGH MLU intends to extend the life cycle of two frigates. For this purpose,
upgrade activities will be performed to the Sensors, Weapons and C4I (further mentioned as
SEWACO) Systems and to Platform systems.
Furthermore, PRT Navy requires to increase the Ocean Patrol Vessels (OPV) fleet to replace
the old Corvettes classes. In that respect, the new construction program for 6 (six) new ships
of the third series (3S) of OPV class has been initiated by PRT Ministry of Defense (MoD).
Upon considering the system requirements for both classes of ships, a significant level of
commonality has been planned. Concurrently, the procurement activities are scheduled within
the same timeframe. This commonality presents various benefits in terms of scale-effect
procurement, cost-effective system engineering, project management, and integrated logistics
support. These advantages include:

- Reduced costs associated with larger scale procurement, designing, manufacturing,
and maintaining different types of equipment.
- Simplified logistics by reducing the logistic dispersion, and thus the range of different
equipment, spare parts, special tools and equipment to provide support.
- Improved interoperability between different types of equipment by enabling them to
share Education & Training, simulators, maintenance resources, spare parts, systems,
or procedures.
Therefore, the systems acquisition programs are decided to be merged


É interessante que o concurso tenha sido anunciado...
... depois suspenso...
... depois foi publicado um despacho para a compra directa pelo governo do equipameno dos NPO (ou estou enganado???)
... e agora aparece o concurso novamente nos mesmos moldes - a incluir o equipamento dos NPO.

Um colega aqui do forum insinuou que eu "não sei como a compra deste tipo de material é feita..."
Parece que a Marinha também não.   
                                                                           ::)
4
Marinha Portuguesa / Re: Substituição das Fragatas Classe Vasco da Gama
« Última mensagem por saabGripen em Hoje às 07:23:26 pm »

  Concurso de Modernização das VdG e Equipamento dos NPO


O concurso na NSPA com o nome "FFGH MLU/OPV SEWACO " foi reactivado hoje, com prazo de conclusão de 30 de Junho.

Mantém as mesmas características.


Vasco da Gama Class Frigates (VGAM FFGH) are currently in use by the Portuguese Navy.
The VGAM FFGH MLU intends to extend the life cycle of two frigates. For this purpose,
upgrade activities will be performed to the Sensors, Weapons and C4I (further mentioned as
SEWACO) Systems and to Platform systems.
Furthermore, PRT Navy requires to increase the Ocean Patrol Vessels (OPV) fleet to replace
the old Corvettes classes. In that respect, the new construction program for 6 (six) new ships
of the third series (3S) of OPV class has been initiated by PRT Ministry of Defense (MoD).
Upon considering the system requirements for both classes of ships, a significant level of
commonality has been planned. Concurrently, the procurement activities are scheduled within
the same timeframe. This commonality presents various benefits in terms of scale-effect
procurement, cost-effective system engineering, project management, and integrated logistics
support. These advantages include:

- Reduced costs associated with larger scale procurement, designing, manufacturing,
and maintaining different types of equipment.
- Simplified logistics by reducing the logistic dispersion, and thus the range of different
equipment, spare parts, special tools and equipment to provide support.
- Improved interoperability between different types of equipment by enabling them to
share Education & Training, simulators, maintenance resources, spare parts, systems,
or procedures.
Therefore, the systems acquisition programs are decided to be merged



5
Conflitos do Passado e História Militar / Re: Expansão portuguesa
« Última mensagem por Lusitano89 em Hoje às 06:57:10 pm »
A VIAGEM DE GIL EANES | Como os PORTUGUESES dobraram o CABO BOJADOR



6
Força Aérea Portuguesa / Re: F-35A Lightning II na FAP
« Última mensagem por Visitante123 em Hoje às 06:40:45 pm »
De acordo com testemunhos no congresso dos EUA embora hajam números a dizer que 55% dos F-35 estão "operational" só 29% dos F-35 estão "fully mission operational". Os outros (55%-29%) aparentemente estão capazes apenas para treino ou missões menores.

Deixem-me reiterar que por os ovos todos no F-35 não é boa ideia.
7
Serviços de Informações e Inteligência / Re: Serviços Secretos em Acção
« Última mensagem por Lusitano89 em Hoje às 06:30:39 pm »
Polícia alemã deteve dois homens suspeitos de serem espiões russos


8
Área Livre-Outras Temáticas de Defesa / Re: Arqueologia/antropologia/ADN
« Última mensagem por Lusitano89 em Hoje às 06:28:28 pm »
9
Força Aérea Portuguesa / Re: F-35A Lightning II na FAP
« Última mensagem por Pilotasso em Hoje às 06:13:06 pm »
Em relação ao substituto dos F-16 eu também sou a favor do mais evoluído possível, como o F-35 americano.

Mas estaria o pessoal disponível para a seguinte situação?

Caso a UE abra financiamento para a defesa e obrigue a gastar o dinheiro na UE, e/ou nos aproximassemos da França (com pacotes militares gerais como artilharia, AAA, etc).

Podiamos comprometemos com o FCAS, mas nestas coisas nós como queremos gastar o mínimo somos sempre dos últimos a receber (o que também têm o seu lado bom, que a aeronave já vêm com algumas imperfeições corrigidas).

A França arranjar uns 30 Rafale em leasing até o FCAS  ser entregue...?

Se assim fosse  :arrow: Grippen all the way.

Tanto o Tempest como FCAS são muito complexos e bi-motores, e o Alpha jet não serve como precedente  :mrgreen:
O FCAS está no limbo seguindo a tradição do Eurofighter, não vejo esse caça a voar antes de 2040 apesar do que a AIRBUS diz, vamos ter de tomar uma decisão antes disso.
10
Marinha Portuguesa / Re: Plataforma Naval Multifuncional
« Última mensagem por P44 em Hoje às 06:11:40 pm »
Isto é como um gajo não ter dinheiro para uns pneus mas sonhar com um Ferrari
Páginas: [1] 2 3 4 5 6 ... 10